List of Authorised Operations in SEZs Considered as Automatically
Approved
[SEZ Circular No. 35 dated
4th September 2009]
Sub: Consolidated list of default
authorized operations which can be undertaken by the developer/approved
co-developer by default from the date of notification.
In continuation of this Department’s communication No F.
1/153/2007-SEZ dated 22nd August 2008, it has been decided to further expand
the list of default authorized operations. The BoA in
its meeting held on 11th August 2009 added a few items and Government has
decided to add more items. Accordingly a consolidated list of authorized
operations is enclosed as Annexure.
The DC’s/UAC’s may allow Developer/approved co-developers duty
free material for these default authorized operations from the date of
notification of the SEZ. These authorized
operations will, however, continue to be subject to the various guidelines
issued by Government from time to time.
2. For other authorized activities, not contained in the enclosed
list, Developer/co-developer will have to obtain prior approval of Board of
Approval.
Annexure
Authorized Activities which can be undertaken by the Developer/Approved
Co-Developer by Default from the Date of Notification
(A) For All Types of SEZs
1. Roads with Street lighting, Signals and Signage
2. Water treatment plant, water supply lines (dedicated lines up to
source), sewage lines, storm water drains and water channels of appropriate
capacity.
3. Sewage and garbage disposal plant, pipelines and other necessary infrastructure
for sewage and garbage disposal, Sewage treatment plants
4. Electrical, Gas and Petroleum Natural Gas Distribution Network
including necessary sub-stations of appropriate capacity, pipeline network etc.
5. Telecom and other communications facilities including internet
connectivity
6. Rain water harvesting plant
7. Fire protection system with sprinklers, fire and smoke detectors
8. Landscaping and water bodies
9. Boundary wall
10. Office space for Customs and Security staff not exceeding 500 sq.m.
11. Office space for staff deployed for DC’s office, customs and
Security staff
12. Security offices, police posts, etc, at entry, exit and other
points within and along the periphery of the site.
13. Effluent treatment plant and pipelines and other Infrastructure for
Effluent treatment
14. Common Data centre with inter-connectivity
15. Play ground
16. Bus bays
17. Wi Fi/Wi Max Services
18. Drip and Micro irrigation systems
19. Parking including Multi-level car parking (automated / manual)
20. Recreational facilities such as Indoor/Outdoor games, gymnasium
21. Employee welfare facilities like Crèche, Medical center and other
such facilities
(B) IT/ITES/EH&SW,
Biotechnology/Gems and Jewellery SEZ/Handicrafts/Non-conventional
Energy including solar energy equipments [in addition to those listed at (A)]
1. Air conditioning of processing area
2. Built up processing area not less than minimum prescribed 1 lakh
sq. m.
3. One First-Aid post or 10-beded Clinic/Poly clinic/Pharmacy/
Medical Center
4. Power ( including power back up facilities) for captive use only
(C) Sector Specific Special
Economic Zones or one or more Services or in a port or airport [in addition to
those listed at (A)]
1. Fire Station Buildings
2. Fire protection system with sprinklers, fire and smoke detectors
3. Access control and Monitoring system
4. First-Aid post or 20-beded Clinic/Poly clinic/Pharmacy/ Medical
Center, one hospital (up to 50 bed) (in the non-processing area only)
5. One Primary School (in the non-processing area only).
6. Power (including power back up facilities) for captive use only
(D) Special Economic Zones
for Free Trade and Warehousing [in addition to those listed at (A)]
1. Air conditioning of processing area
2. Built up processing area not less than minimum prescribed 1 lakh
sq. m.
3. One First-Aid post or 10-beded Clinic/Poly clinic/Pharmacy/
Medical Center
4. Power ( including power back up facilities) for captive use only
(E) Multi Product Special
Economic Zones [in addition to those listed at (A)]
1. Factory sheds
2. Fire Station Buildings
3. Access control and Monitoring system
4. Space for Banks
5. First-Aid post(s) and/or 20-beded Clinic(s)/Poly
clinic(s)/Pharmacy(s)/ Medical Center(s), one hospital (up to 50 bed) (in the
non-processing area only).
6. One Primary School (in the non-processing area only).
7. Power (including power back up facilities) subject to power
guidelines.
Note: “For IT/ITES/EHS, Bio-technology, Gems & Jewellery,
Handicrafts sector, Non-Conventional Energy including solar energy
equipments/cell and Stand alone FTWZs SEZs of 100 Hectares or more also, the
above guidelines shall be applicable”.
No. C.8/4/2009-SEZ