Excise Exemption
for Only 111 Mega Power Projects Listed under Project Imports Till 19 July 2012
[Ref: 34-Central Excise
dated 10 September 2012]
In exercise of the powers conferred by sub-section
(1) of section 5A of the Central Excise Act, 1944 (1 of 1944), the Central
Government, on being satisfied that it is necessary in the public interest so
to do, hereby makes the following further amendments in the notification of the
Government of India, in the Ministry of Finance (Department of Revenue), No.
12/2012-Central Excise, dated the 17th March, 2012, published in the
Gazette of India, Extraordinary, Part II, Section 3, Sub-section (i), vide number
G.S.R. 163(E), dated the 17th March, 2012, namely:-
In the said notification, -
(A) in the
Table,
(i) against Sl. No. 337,
in the entries under column (3), for the words “required for setting up of an
ultra-mega power project”, the words and figures “required for setting up of an
ultra-mega power project specified in List 10,” shall
be substituted;
(ii) against S.No. 338, in the entries under column (3),
for the words “supplied to mega power projects”, the words and figures
“supplied to mega power projects specified in List 11,” shall be substituted;
(iii)
against S.No. 339, in the entries under column (3),
for the words “expansion of an existing mega power project so certified”, the
words, figures and symbols “expansion of mega power projects, namely, Vindhyachal STPP Stage-V (Expansion Unit) - 500 MW (NTPC)
and UNOSUGEN CCPP, Gujarat (An expansion unit of Sugen
CCPP of 1147.5 MW)- 382.5(1) MW (M/s. Torrent Power Ltd.) so certified before
the 19th day of July, 2012” shall be
substituted;
(B) in the ANNEXURE,
(i) in the Condition No. 42, in clause
(a), after the words “mega power project”, the words “before the 19th
day of July, 2012” shall be inserted;
(ii) in the
Condition No. 43, in clause (a), after the words “Mega Power Project”, the
words “before the 19th day of July, 2012” shall be inserted;
(iii) after List 9 and the entries relating
thereto, the following Lists and entries shall be inserted, namely:-
“List
10 (See S. No. 337 of the Table)
1 Krishnapatnam UMPP, Andhra Pradesh- 6x660= 3960 MW (Coastal
Andhra Power Ltd.)
2 Mundra UMPP, Gujarat- 5x800= 4000 MW (Coastal Gujarat
Power Ltd.)
3 Sasan, Madhya Pradesh- 6x660= 3960 MW (Sasan Power Ltd.)
4 Tilaiya UMPP, Jharkhand- 5x800= 4000 MW (Jharkhand
Integrated Power Ltd.)
5 Orissa UMPP, Orissa- 5x800= 4000 MW
6 Chhattisgarh UMPP, Chhattisgarh- 5x800= 4000 MW
7 Cheyyur UMPP,- 5x800= 4000MW
List
11 (See S. No. 338 of the Table)
1 Parbati-II,
Himachal Pradesh - 4x200=800
MW (NHPC)
2 Teesta- V, Sikkim - 3x170=510 MW
(NHPC)
3 Sipat-II,
Chhattisgarh - 2x500=1000 MW (NTPC)
4 Vindhyachal-III,
Madhya Pradesh - 2x500=1000 MW (NTPC)
5 Talcher-II,
Orissa - 4x500=2000 MW (NTPC)
6 Rihand-II, Uttar
Pradesh - 2x500=1000 MW (NTPC)
7 Sipat-I,
Chhattisgarh - 3x660=1980 MW (NTPC)
8 Kahalgaon-II
Phase-I & II Bihar - 3x500=1500 MW (NTPC)
9 Barh, Bihar -
3x660=1980 MW (NTPC)
10 Koldam, Himachal
Pradesh - 4x200=800 MW (NTPC)
11 Tuticorin, Tamil
Nadu- 2x500=1000 MW (NLC)
12 Parbati-III,
Himachal Pradesh - 4x130=520 MW (NHPC)
13 Jhanor Gandhar CCPP-II, Gujarat - 2x650=1300 MW (NTPC)
14 Kawas CCPP-II,
Gujarat - 2x650=1300 MW (NTPC)
15 RGPPL, Maharashtra - 2150 MW (JV of NTPC/
GAIL/ Govt. of Maharashtra)
16 Tapovan Vishnugad HEP, Himachal Pradesh - 4x130=520 MW (NTPC)
17 Simhadri-II,
Andhra Pradesh - 2x500=1000 MW (NTPC)
18 Indira Gandhi
STPP-JV project, Haryana - 3x500=1500 MW (NTPC)
19 Bongaigaon, Assam
- 3x250=750 MW (NTPC)
20 Barh-II, Bihar -
1320 MW (NTPC)
21 Koderma TPS St-I,
Jharkhand – 1000 MW (DVC)
22 Durgapur Steel TPS, West Bengal - 2x500=1000
MW (DVC)
23 Tehri Pump Storage
Project – 4x250=1000 MW (THDC)
24 Mauda, Maharashtra
– 2x500=1000 MW (NTPC)
25 Rihand- III, Uttar
Pradesh - 2 x 500=1000 MW (NTPC)
26 Nabinagar- JV with
Railways, Bihar - 4 x 250=1000 MW (NTPC)
27 Vallur Stage- I
Phase I & II, Tamil Nadu - 3 x 500=1500 MW (NTPC-Tamil Nadu Energy Co.
Ltd.)
28
Raghunathpur TPS
Phase 1, West Bengal - 2 x 600=1200 MW (DVC)
29 Tanda- II, Uttar
Pradesh-2 x 660=1320 MW (NTPC)
30 Meja, Uttar
Pradesh - 2 x 660=1320 MW (NTPC)
31 Vindhyachal-IV,
Madhya Pradesh - 2 x 500=1000 MW (NTPC)
32 Solapur STPP,
Maharashtra - 2x660=1320 MW (NTPC)
33 Nabinagar STPP, JV
with Bihar, Bihar-3x660=1980
MW (NTPC)
34 Mouda STPP-II,
Maharashtra- 2x660= 1320 MW (NTPC)
35 Raghunathpur TPS
(Ph-II), West Bengal- 2x660=1320 MW (DVC)
36 North Karanpura
STPP, Jharkhand- 3x660=1980 MW (NTPC)
37 Kudgi STPP stage-I,
Karnataka- 3x800=2400 MW (NTPC)
38 Darlipalli STPP,
Stage-I, Orissa- 2x800=1600 MW (NTPC)
39 Barethi STPP,
Madhya Pradesh- 6x660=3960 MW (NTPC)
40 Lara STPP, Chhattisgarh -2x800=1600 MW
(NTPC)
41 Gajmara STPP
Stage-I - 2x800= 1600MW (NTPC)
42 Rajiv Gandhi CCPP Stage- II Phase-I, Kerala- 3x350 =1050 MW
(NTPC)
43 Gidderbha STPP,
Punjab - 4x660= 2640 MW (NTPC)
44 Khargone Super
TPP, M.P. - 2x660= 1320 MW (NTPC)
45 Gadarwara Super
TPP, M.P. - 2x660= 1320 MW (NTPC)
46 Katwa Super TPP,
West Bengal - 2x800= 1600 MW (NTPC)
47 Bilhapur STPP,
Uttar Pradesh -2x660= 1320 MW (NTPC)
48 Talcher STPP
Stage-III, Orissa - 2x660=1320 MW (NTPC)
49 Khedar (Hissar), Haryana - 1000 (+200) MW (HPGCL)
50 Khandwa, Madhya
Pradesh - 2x500= 1000 MW (MPPGCL)
51 Gas based CCPP Pragati-III,
Delhi-1371.6 MW (Pragati Power Corp. Ltd.)
52 Sri Damodaran Sanjeevaiah, Nellaturu, Andhra
Pradesh - 2x800=1600 MW (APPDCL)
53 Chandrapur
Expansion, Maharashtra- 2x500= 1000 MW (MSPGCL)
54 Koradi Expansion,
Maharashtra- 3x660= 1980 MW (MSPGCL)
55 Bhusawal
Expansion, Maharashtra- 2x500= 1000 MW (MSPGCL)
56 Supercritical TPP at STPS Stage-V at Suratgarh, Rajasthan- 2x660)= 1320
MW (RRVUNL)
57 Supercritical TPP at Chhabra,
Rajasthan - 2x660= 1320 MW (RRVUNL)
58 North Chennai, Tamil Nadu-2x600=1200 MW (TNEB)
59 Purulia Pump
Storage Hydel Project, West Bengal- 4x225= 900 MW
(State Sector)
60 Sagardighi TPP
Ext. Unit 3&4, West Bengal-2x500=1000 MW (WBPDCL)
61 Shree Singaji
TPP-2x660 (MP Power Generating Company Ltd MW (MPPGCL)
62 Raigarh
TPP, Chhattisgarh- 4x250= 1000 MW (M/s. Jindal Power
Ltd.)
63 Akhakhol GBPP,
Gujarat- 3x382.5= 1147.5 MW (M/s. Jindal Power Ltd.)
64 Udupi (Nagarjuna) Power Project, Karnataka- 2x600= 1200 MW (M/s. Udupi (Nagarjuna) Power Corp.
Ltd.)
65 IPP project Haryana- 2x660= 1320 MW (M/s. Jhajjar Power Ltd.)
66 726 MW CCGT being developed by ONGC-Tripura
Power Company Ltd. (OTPC) at Palatana, Tripura -
(2x250)(2x113.3)= 726 MW
67 Salaya
TPP, Gujarat- 2x600= 1200 MW (M/s. Essar Power
Gujarat Ltd.)
68 Tiroda TPP,
Maharashtra-5x660=3300 MW (M/s. Adani Power
Maharashtra Ltd.)
69 Kawai TPP, Rajashtan - 2x660=1320 MW (M/s. Adani
Power Rajasthan Ltd.)
70 Teesta-VI, Sikkim
- 4x125= 500 MW (M/s. Lanco)
71 Teesta-III Sikkim-
6x200= 1200 MW (M/s. Teesta Urja
Ltd.)
72 KSK Mahanadi Power Company Ltd.(U-3 & 4) Janjgir- Champa, Chhathisgarh-2x600=1200 MW (M/s KSK Mahanadi Power
Co Ltd.)
73 Rajpura
TPP in the State of Punjab- 2x700= 1400 MW (M/s. Nabha
Power Ltd.)
74 Talwandi Sabo
power project at Banawala, Punjab.-
3x660=1980 MW (M/s. Talwandi Sabo Power Ltd. (TSPL))
75 TPP at Nandgaonpeth,
MIDC, Amravati Dist,. Maharashtra.-
5x270= 1350 MW (M/s. Indiabulls Power Ltd.)
76 TPP at Karachhana,
Allahabad, UP- 2x660 = 1320 MW (M/s. Sangam Power Gen
Company Ltd.)
77 TPP at Bara, Allahabad, UP. - 3x660=1980 MW
(M/s. Prayagraj Power Gen. Company Ltd.)
78 TPP at Surguja,
Chhattisgarh- 2x660 = 1320 MW (M/s. IFFCO Chhattisgarh Power Ltd.)
79 TPP at Dhenkanal,
Orissa- 3x350=1050 MW (M/s. GMR Kamalanga Energy Ltd.)
80 GMR Chhattishgarh
Energy Ltd. Raipur, Chhattisgarh- 2x685 MW
81
KSK Mahanadi Power Corporation Ltd.
(U-2&5) Janjgir Champa,
Chhattisgarh- 2x600 MW
82
KSK Mahanadi Power Corporation Ltd.
(U-1&6) Janjgir Champa,
Chhattisgarh- 2x600 MW
83
Thermal Powertech
Corporation Ltd. Pynampuram Andhra Pradesh- 2x660 MW
84 KVK Neelanchal
Power Pvt. Ltd Cuttak, Orissa- 3x350 MW
85 East-Coast Energy Pvt. Ltd Srikakulam, Andhra Pradesh.- 2x660
MW
86
Monnet Power Corporation Ltd. Malibrahmani, Orissa- 2x525 MW
87
Hinduja
National Power Corporation Ltd. Vishakhapatnam, Andhra Pradesh- 2x520 MW
88
Corporate Power Ltd. Chandwa, Jharkhand- 4x270 MW
89
Lanco Power
Ltd. (U-3,4) Pathadi,
Chhattisgarh- 2x660 MW
90
Lalitpur
Power Generation Company Ltd. Lalitpur, U.P.- 3x660 MW
91
Lanco Vidarbha Thermal Power Ltd. Wardha,
Maharashtra- 2x660 MW
92
Lanco Babandh Power Ltd. Dhenkanal,
Orissa- 2x660 MW
93
DB Power Ltd. Vadodarha
TPP Janjgir – Champa Chattisgarh- 2x660 MW
94
Athena Chhattisgarh Power Ltd. Singhitarai TPS Janjgir-Champa, Chattisgarh- 2x600 MW
95
Essar Power
Jharkhand Ltd. Tori, Jharkhand- 2x600 MW
96
MB Power (MP) Ltd. Anuppur, Madhya Pradesh-
2x600 MW
97
RKM Powergen
Pvt. Ltd. Uchpinde TPP Janjgir-
Champa, Chattisgarh- 4x360
MW
98
IL & FS Tamil Nadu Power Company
Ltd. Cuddalore, Tamil Nadu- 2x600 MW
99
Meenakshi
Energy Pvt. Ltd Thamminapatanam, Andhra Pradesh-Ph-1:2x 150 Ph-II 2x350 MW
100
SKS Power Generation (Chhattisgarh) Ltd. Binj Kote TPP Raigarh,
Chhattisgarh- 4x300 MW
101
Jindal India
Thermal Power Ltd. Angul, Orissa- 2x600 MW
102 NCC
Power Projects Nellore AP- 2x660 MW
103
Samalkot Power
Ltd. Samalkot, Andhra Pradesh- 2400 MW
104
Torrent Energy Ltd. Dahej,
Gujarat- 1200 MW”.
[F.No.
354/78/2010-TRU(Pt-1)]